House construction update for this week: Most of the interior framing is done, and all of the windows are in. The exterior door from the office and the french doors to the screen porch are in, and we have stairs in the garage to the room above.

2016-05-07_DSC07268sBonus room over the garage:

It’s a relief to be just about dried in. We’ve had a lot of rain, and it will be nice to be able to keep the water off of everything, and from blowing in and sitting on the floor. The interior walls going up made for a very dramatic change this week. That framing went really quickly!

This entry was posted in Home Improvement, House 2.0. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s