House 2.0 – front porch, plumbing, misc interior framing

As the post title says, house construction progress for this week includes: more interior framing (mostly interior doors, and modifying access under the garage stairs), the start of some plumbing, and construction of the front porch.

2016-05-15_DSC07335sThe plumbers were on site just one day, but I was really amazed at how much they got done. (Seriously, impressively fast progress. There were 4 or 5 guys, and they weren’t in the house 5 minutes before they were busy with the hole saws, and the entire house smelled like pvc glue. Most of the plumbing in the house is PEX).

Throwing in some exterior photos from the back, just because its been awhile.

This entry was posted in Home Improvement, House 2.0. Bookmark the permalink.

2 Responses to House 2.0 – front porch, plumbing, misc interior framing

  1. Mom says:

    The porch adds some nice dimension to the front of the house!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s