House 2.0 – Inspections, insulation, septic, porch

Lots of progress on the house this week –  We passed the electrical, plumbing, HVAC, framing, and septic inspections. Rough systems are done!  That meant the insulation crew could start. They only needed two days, since most of the house is SIPS. They insulated the garage, the room over the garage, mudroom ceiling, between floors (including some in the crawl space, which was already mostly insulated from superior walls), and some interior walls between rooms to help with noise attenuation. The crew installing the septic system was done in one day, including the inspection. The porch slab also got poured – no more stepping on a bucket to go in the front door:)

This entry was posted in Home Improvement, House 2.0. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s