House 2.0 – flooring, trim carpentry, interior doors, HVAC

House construction as of this week:

  • Wood floors are installed, including stair treads, and are ready to be finished
  • Tile flooring is installed, still needs grout
  • Trim carpentry has started, and they are making remarkably fast progress. We’re very happy with the quality of this work, which includes baseboards (w/ trim cap), window and door trim, closets, as well as some custom built-ins. It all looks really nice.
  • We have some interior doors!
  • The outside units for the mini-splits were installed. We’re very close to being able to condition the inside of the house, just in time for fall in NC, when we don’t actually need heating or cooling.

 

This entry was posted in Home Improvement, House 2.0. Bookmark the permalink.

2 Responses to House 2.0 – flooring, trim carpentry, interior doors, HVAC

  1. jml248 says:

    found you via gardenweb, love love love your house. Keep the photos coming!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s